A) flowchart
B) algorithm
C) logical steps
D) All of the above
View Answer
Option – B.
More Questions
6 men can complete a piece of work in 12 days. 8 women can complete the same piece of work in 18 days whereas 18 children can complete the piece of work in 10 days. 4 men, 12 women and 20 children work together for 2 days. If only men were to complete the remaining work in 1 day how many men would be required totally?
Ronika deposited Rs.7000 which amounted to Rs.9200 after 3 years at simple interest. Had the interest been 2% more. She would get how much ?
If log 2 = 0.3010 and log 3 = 0.4771, the values of log5 512 is
Lime is sometimes applied to soil in order to
Hydrogen atom is excited from ground state to another state with principal quantum number equal to 4. Then the number of spectral lines in the emission spectra will be
The calendar of the year 2006 was used before in the year?
Which of the following is an air pollutant?
The universal donor belongs to blood group
The leaves used as wrappers for bides are obtained from which one of the following ?
Of which ITIL process are Reliability, Serviceability and Maintainability components?