A) None – Cost estimating requires details to be accurate
B) Use the cost of similar projects
C) Use a rule-of-thumb or per-square-foot estimate
D) Add up the costs on the WBS
A) None – Cost estimating requires details to be accurate
B) Use the cost of similar projects
C) Use a rule-of-thumb or per-square-foot estimate
D) Add up the costs on the WBS