Industrial Engineering MCQ Questions Answers – Mechanical Engineering
1) Which of the following card is not used ing dispatching ?
a) Work order
b) Time card
c) Inspection tickets
d) Order scheduling
2)In Lincoln plan (one type of group incentive plan), the amount of the profit which an employee receives in addition to the guaranteed basic pay/wages, is based on:
(A) A standard rating system
(B) A merit rating system
(C) A job evaluation system
(D) His individual performance
3) Routing and scheduling are integral part of
a) product planning
b) work study
c) job analysis
d) quality control
4)Break-even analysis consists of
(A) Fixed cost
(B) Variable cost
(C) Fixed and variable costs
(D) Operation costs
5) Which of the following is not a function of production control ?
a) Forecasting
b) Routing
c) Scheduling
d) Dispatching
6)Which one of the following represents a group incentive plan?
(A) Scanlon Plan
(B) Rowan Plan
(C) Taylor Differential Piece Rate System
(D) Halsey Premium Plan
7) Chart which is useful scheduling and control is
a) Kanban
b) Gantt chart
c) X and R chart
d) Flow process chart
8)Work study is concerned with
(a) improving present method and finding standard time
(b) motivation of workers
(c) improving production capability
(d) improving production planning and control
(e) all of the above.
9) Using the Shortest Processing Time (SPT) rule, total tardiness is
a) 0
b) 2
c) 6
d) 8
10)Micromotion study is
(a) enlarged view of motion study
(b) analysis of one stage of motion study
(c) minute and detailed motion study
(d) subdivision of an operation into therbligs and their analysis
(e) motion study of small components upto mircoseconds.