11) Sequencing is a subset of
a) routing
b) scheduling
c) expediting
d) none of the above
12)The process layout is best suited where
(a) specialisation exists
(b) machines are arranged according to sequence of operation
(c) few number of nonstandardised units are to be produced
(d) mass production is envisaged
(e) bought out items are more.
13)Which of the following organisations is best suited for steel plants
(a) functional organisation
(b) line organisation
(c) staff organisation
(d) line, staff and functional organisations
(e) scalar organisation.
14) Lines needs to be balanced in
a) product layout
b) process layout
c) functional layout
d) fixed position layout
15) Select the odd one :
a) Concurrent engineering
b) Simultaneous engineering
c) integrated product development
d) Reliability
16) Gradual, long-term movement in time-series data is called
a) seasonal variation
b) cycles
c) trends
d) exponenitial variations
17) Which of the following is the measure of forecast error ?
a) Mean absolute deviation
b) Trend value
c) Moving average
d) price fluctuation
18) Breakeven analysis consist of
a) fixed cost
b) variable cost
c) fixed and variable costs
d) operation costs
19) The number of fundamental motions involved in micromotion study are
a) twelve
b) sixteen
c) seventeen
d) twenty four
20) Which one among the following is a Therblig ?
a) Get
b) Step
c) Put
d) Position