A) fit
B) able
C) unready
D) prepped
View Answer
Option – C.
Similar Questions
If MADRAS can be written as NBESBT, how can BOMBAY be written in that code ?
Which one of the following is not a true snake ?
Insert the missing number. 8, 7, 11, 12, 14, 17, 17, 22, (….)
Codes consisting of bars or lines of varying widths or lengths that are computer readable are known as ____
The main reason of Ozon depletion is
Heed : Neglect : :Pacify : ?
What is deposited on iron in the process of galvanization?
12 days payment to the servant in a cloth showroom in festival season is Rs. 400 plus one shirt. The servant leaves after 9 days and recieves Rs. 280 and a shirt. What is the price of the shirt ?
Hot water is poured simultaneously in four metallic tumblers painted outside with different paints. After some time the water will be found to have cooled most in the tumbler painted.
The average of six numbers is x and the average of three of these is y. If the average of the remaining three is z, then :